System design, installation and commissioning Fire system installers follow AS 2419—Fire hydrant systems – System design, installation and commissioning and in accordance to Part E1 of the National...
Hydrostatic pressure testing is a process of filling a fire hydrant or booster system with water and pressurising it to test its ability to withstand the designated pressure that would be applied...
Background A 2021 audit commissioned by the Office of the Building Commissioner found recommendations in ways to improve fire safety in class 2 residential buildings. These recommendations involve...
In fire emergencies where the main water source does not provide sufficient pressure to reach higher or more difficult areas, firefighters attach a hose from the main hydrant to the firetruck, boost...